simutec@126.com
(86)027-82333193

Customer case

Gu'an Beam Fabrication Site of China Railway 19th Bureau Group First Engineering Co., Ltd.

  • 2019-01-10

In August 2018, the beam fabrication site completed a static load test with t-

details

Taihe Beam Fabrication Site of Fifth Bidding Section of Shangqiu-Hefei-Hangzhou Pre-station of China Railway Tunnel Stock Co., Ltd.

  • 2019-01-10

On Feb. 20, 2017, the Beam Fabrication Site conducted the static load test of

details

Shujia Lake Beam Fabrication Site of China Railway 11th Bureau Group Co., Ltd.

  • 2019-01-10

On Feb. 20, 2017, the Beam Fabrication Site used the automatic static load te-

details

Huarong East Beam Fabrication Site of The Fourth Engineering Co., Ltd. of China Railway 16th Bureau Group

  • 2018-12-27

During the period from November 2012 to May 2013, our Company used the "micro-

details

Sinohydro Bureau 8 Co., Ltd.

  • 2018-12-24

During the period from October 2014 to January 2015, Sinohydro Bureau 8 Co.,

details

Tianmen City Engineering Company

  • 2018-12-24

On Jul. 25, 2013, Tianmen City Engineering Company bought a set of the intell-

details